News for Peterborough and Cambridgeshire
  • News
  • Crime
  • Things To Do
  • Your Views
No Result
View All Result
  • TRENDING:
  • Peterborough
  • Cambridge
  • Huntingdon
  • March
  • Wisbech
  • Ely
  • Fenland
  • Whittlesey
  • St Ives
Sunday, June 15, 2025
News for Peterborough and Cambridgeshire
  • News
  • Crime
  • Things To Do
  • Your Views
No Result
View All Result
News for Peterborough and Cambridgeshire
Support Us
No Result
View All Result
  • News
  • Crime
  • Things To Do
  • Your Views
Home News

1,280 per cent standing charge rise ‘punitively eyewatering’ says chief executive

John Elworthy by John Elworthy
10:13am, January 9 2024
in News
News for Peterborough and Cambridgeshire - Middle Level Commissioners chief executive Paul Burrows has responded to OFGEM by pointing out that the standing charge for St Germans Pumping Station has increased by 1282% from £3,915 to £54,140 a year. The winter has proved challenging for Middle Level.

Middle Level Commissioners chief executive Paul Burrows has responded to OFGEM by pointing out that the standing charge for St Germans Pumping Station has increased by 1282% from £3,915 to £54,140 a year. The winter has proved challenging for Middle Level.

Share on FacebookShare on Twitter

Chief executive Paul Burrows of the Middle Level Commissioners described increases in electricity standing charges as “punitively eyewatering”. The standing charge for St Germans Pumping Station, he says, has increased by 1,282% from £3,915 to £54,140.

“Across our portfolio of assets there are 67 electric meters and the standing charges have increased in total by 509% from £25,547 to £155,662 as a result of the Targeted Charging Review,” says Mr Burrows.

Middle Level Commissioners chief executive Paul Burrows has responded to OFGEM by pointing out that the standing charge for St Germans Pumping Station has increased by 1282% from £3,915 to £54,140 a year. The winter has proved challenging for Middle Level.
Middle Level Commissioners chief executive Paul Burrows has responded to OFGEM by pointing out that the standing charge for St Germans Pumping Station has increased by 1282% from £3,915 to £54,140 a year. The winter has proved challenging for Middle Level.

He has responded to OFGEM’s review of standing charges and claims “the Targeted Charging Review did not consider the bespoke needs and role of the Internal Drainage Board (IDB) sector within its concept and therefore its implementation has been unfair”.

The chief executive told OFGEM: “The dramatic step-change increase in standing charges has had to be borne by our ratepayers (i.e. farmers and land managers within the district who benefit from the pumping) and via special levies on district councils within these areas.

Advertisement
Advertisements
Pictures

“The latter is passed on to residents via Council Tax creating additional financial burdens on Council-delivered critical public services.”

“Electricity costs form a significant proportion of IDBs’ overall revenue expenditure, therefore the impact of the Targeted Charging Review, if it continues, will have a disproportionate impact on our public service objectives and place people, businesses and critical infrastructure at greater flood risk, increasing the risk to life and livelihoods.”

Middle Level Commissioners chief executive Paul Burrows has responded to OFGEM by pointing out that the standing charge for St Germans Pumping Station has increased by 1282% from £3,915 to £54,140 a year. The winter has proved challenging for Middle Level.
Middle Level Commissioners chief executive Paul Burrows has responded to OFGEM by pointing out that the standing charge for St Germans Pumping Station has increased by 1282% from £3,915 to £54,140 a year. The winter has proved challenging for Middle Level.

Middle Level is responsible for 190km of embanked watercourses, 160km of which are statutory navigations, and two major pumping stations.

This system moves excess water from the lowest land in the country into the Tidal River Great Ouse via St Germans Pumping Station. The current pumping station, opened in April 2010, is the largest of its type in the UK, with a maximum pumping capacity of 100 cubic metres.

Advertisement

Following Storm Henk in early January St Germans Pumping Station reached a record volume of 77 cumecs of water being pumped (100 cumec max capability).

Middle Level Commissioners chief executive Paul Burrows has responded to OFGEM by pointing out that the standing charge for St Germans Pumping Station has increased by 1282% from £3,915 to £54,140 a year. The winter has proved challenging for Middle Level.
Middle Level Commissioners chief executive Paul Burrows has responded to OFGEM by pointing out that the standing charge for St Germans Pumping Station has increased by 1282% from £3,915 to £54,140 a year. The winter has proved challenging for Middle Level.

Middle Level provides flood protection to more than 8,000 homes, at least 1,600 commercial properties, 57,000 hectares of farmland and vital road, rail, and power infrastructure.

Mr Burrows said: “This winter is likely to prove a record breaking one for land drainage pumping here in the Fens with record volumes already having been pumped at our St Germans Pumping Station.

“We provide a critical public service that not only protects lives and livelihoods from flooding, but also protects key gas and electricity supply infrastructure.”

Advertisement
Middle Level Commissioners chief executive Paul Burrows has responded to OFGEM by pointing out that the standing charge for St Germans Pumping Station has increased by 1282% from £3,915 to £54,140 a year. The winter has proved challenging for Middle Level.
Middle Level Commissioners chief executive Paul Burrows has responded to OFGEM by pointing out that the standing charge for St Germans Pumping Station has increased by 1282% from £3,915 to £54,140 a year. The winter has proved challenging for Middle Level.

He added: “The costs of pumping are substantial, and the increases we have seen to standing charges over the last 12-month have been punitively eyewatering.

“I urge Government and OFGEM to reconsider their approach to our sector.”

Middle Level Commissioners administer 29 smaller IDBs (jnternal drainage boards) and 24 of which have electric powered pumping stations.

Middle Level Commissioners chief executive Paul Burrows has responded to OFGEM by pointing out that the standing charge for St Germans Pumping Station has increased by 1282% from £3,915 to £54,140 a year. The winter has proved challenging for Middle Level.
Middle Level Commissioners chief executive Paul Burrows has responded to OFGEM by pointing out that the standing charge for St Germans Pumping Station has increased by 1282% from £3,915 to £54,140 a year. The winter has proved challenging for Middle Level.

If you’d like to understand more about how the Middle and South Levels of the Fens works within the Great Ouse catchment, then we’d recommend taking a read of the following publication.

Advertisement

https://www.ada.org.uk/…/Future-Fens-Flood-Risk…

 

Here is the full text of the letter from PAUL BURROWS, chief executive of Middle Level Commissioners, to OFGEM

We welcome OFGEM’s call for input into its review of standing charges. We feel that the Targeted Charging Review did not consider the bespoke needs and role of the Internal Drainage Board (IDB) sector within its concept and therefore its implementation has been unfair.

Indeed, the scope of this review feels biased towards domestic customers, therefore our response is a more general one rather than answering specific questions posed within your consultation.

Advertisement

For more information about the IDB sector please refer to the Association of Drainage Authorities (ADA). Who are we and what do we do?

We are a public authority who protect a large area of the Cambridgeshire and Norfolk Fens from flooding via river embankments, water control structures and pumping stations.

The area is low-lying and below sea level, with some areas of land needing to be pumped three times before rainfall is safely evacuated to sea.

Middle Level Commissioners chief executive Paul Burrows has responded to OFGEM by pointing out that the standing charge for St Germans Pumping Station has increased by 1282% from £3,915 to £54,140 a year. The winter has proved challenging for Middle Level.
Middle Level Commissioners chief executive Paul Burrows has responded to OFGEM by pointing out that the standing charge for St Germans Pumping Station has increased by 1282% from £3,915 to £54,140 a year. The winter has proved challenging for Middle Level.

Here at the Middle Level Commissioners, we administer 29 smaller IDBs and 24 of which have electric powered pumping stations.

Advertisement

We also own and operate St Germans Pumping Station, the largest land drainage pumping station in the UK.

Across our portfolio of assets there are 67 electric meters and the standing charges have increased in total by 509% from £25,547 to £155,662 as a result of the Targeted Charging Review.

The standing charge for St Germans Pumping Station has increased by 1282% from £3,915 to £54,140 and currently only circa 50% of the station’s maximum capacity is served by the grid.

The electricity baseload needs of our assets is relatively low but the maximum capacity we need in times of flood concern is high, with the duration that we need high capacity being relatively short. Our needs are entirely dependent upon the weather and this winter is already proving likely to be a record breaking one for pumping.

Advertisement

Following Storm Henk in early January St Germans Pumping Station reached a record volume of 77 cumecs of water being pumped (100 cumec max capability).

Middle Level Commissioners chief executive Paul Burrows has responded to OFGEM by pointing out that the standing charge for St Germans Pumping Station has increased by 1282% from £3,915 to £54,140 a year. The winter has proved challenging for Middle Level.
Middle Level Commissioners chief executive Paul Burrows has responded to OFGEM by pointing out that the standing charge for St Germans Pumping Station has increased by 1282% from £3,915 to £54,140 a year. The winter has proved challenging for Middle Level.

What are the financial benefits to the electricity sector within the Middle Level?

We estimate that IDB and Environment Agency flood infrastructure within the Middle Level currently avoids £275million of damages to the electricity utility assets. This loss is calculated for damages to electricity generation and distribution assets within the Middle Level of the Great Ouse Fens.

The losses are calculated only where the infrastructure would be permanently lost to flooding. Source: Future Fens Flood Risk Management, Baseline Report (see pages 102, 106, 116) Proudly managing water levels in the Fens since 1862 www.middlelevel.gov.uk How are we funded?

Advertisement

The dramatic step-change increase in standing charges has had to be borne by our ratepayers (i.e. farmers and land managers within the district who benefit from the pumping) and via special levies on District Councils within these areas.

The latter is passed on to residents via Council Tax creating additional financial burdens on Council-delivered critical public services.

Middle Level Commissioners chief executive Paul Burrows has responded to OFGEM by pointing out that the standing charge for St Germans Pumping Station has increased by 1282% from £3,915 to £54,140 a year. The winter has proved challenging for Middle Level.
Middle Level Commissioners chief executive Paul Burrows has responded to OFGEM by pointing out that the standing charge for St Germans Pumping Station has increased by 1282% from £3,915 to £54,140 a year. The winter has proved challenging for Middle Level.

Electricity costs form a significant proportion of IDBs’ overall revenue expenditure, therefore the impact of the Targeted Charging Review, if it continues, will have a disproportionate impact on our public service objectives and place people, businesses, and critical infrastructure at greater flood risk, increasing the risk to life and livelihoods.

Net Zero There are also a small number of diesel-powered pumping stations within the Middle Level that are coming to the end of their design life, along with many stations that use a combination of diesel and electricity.

Advertisement

Schemes to address most of these are within the Government’s Flood & Coastal Erosion Investment Programme funded by Defra via the Environment Agency.

The step-change increase in standing charges has resulted in IDBs being cautious about progressing these much-needed improvements to their assets at a time when Government is looking for delivery authorities to accelerate schemes to improve the nation’s flood resilience.

Middle Level Commissioners chief executive Paul Burrows has responded to OFGEM by pointing out that the standing charge for St Germans Pumping Station has increased by 1282% from £3,915 to £54,140 a year. The winter has proved challenging for Middle Level.
Middle Level Commissioners chief executive Paul Burrows has responded to OFGEM by pointing out that the standing charge for St Germans Pumping Station has increased by 1282% from £3,915 to £54,140 a year. The winter has proved challenging for Middle Level.

Why do we feel the Targeted Charging Review has been unfairly applied to our sector?

1 We were not abusers of the previous charging system and have become a victim of the new system.

Advertisement

2 The critical public service role of Internal Drainage Boards has not been considered, understood, and catered for within the changes that have been applied. We are not commercial profit-making businesses.

Advertisements
canopyuk.com in-article
Advertisement
Cathedral Shaun

3 IDBs cover about 10% of England so the impact of this unfairly penalises people and businesses within lowland areas compared to the remaining 90% of the country. Fenland is also relatively deprived, magnifying the unfairness.

4 Our pumping stations and other infrastructure provides flood protection to the electricity sector (and to its customers), and this has a financial benefit to the sector. The sector makes no financial contribution to IDBs for the flood protection services we provide. This is grossly unfair.

What are we asking of OFGEM? Defra is the government policy lead for Internal Drainage Boards, and we ask that OFGEM work with the Department for Energy Security & Net Zero (DESNZ) and Defra to:

Advertisement

1) Agree an exception case for our sector, and

2) Agree a framework whereby the energy sector financially contributes to relevant revenue and capital expenditure of IDBs where the a) IDB’s infrastructure provides flood protection to energy sector assets and b) there is a residual need to move from diesel to electricity driven pumping.

Paul Burrows Chief Executive, Middle Level Commissioners chiefofficers@middlelevel.gov.uk

January 2024

Advertisement

(Proudly managing water levels in the Fens since 1862 www.middlelevel.gov.uk )

On behalf of the following twenty-five public authorities:

Middle Level Commissioners

 Benwick Internal Drainage Board

Advertisement

 Conington & Holme Internal Drainage Board

 Curf & Wimblington Combined Internal Drainage Board

Euximoor Internal Drainage Board

Haddenham Level Drainage Commissioners

Advertisement

Manea & Welney District Commissioners

March East Internal Drainage Board

March 5th District Drainage Commissioners

 March 6th District Drainage Commissioners

Advertisement

March 3rd District Drainage Commissioners

March West & White Fen Internal Drainage Board

 Nightlayers Internal Drainage Board

Nordelph Internal Drainage Board

Advertisement

Over & Willingham Internal Drainage Board

Ramsey First (Hollow) Internal Drainage Board

Ramsey Fourth (Middlemoor) Internal Drainage Board

Ramsey Upwood & Great Raveley Internal Drainage Board

Advertisement

 Ransonmoor Drainage Commissioners

Sawtry Internal Drainage Board

Sutton & Mepal Internal Drainage Board

Swavesey Internal Drainage Board

Advertisement

Upwell Internal Drainage Board

Waldersey Internal Drainage Board

Warboys, Somersham & Pidley Internal Drainage Board

 

Advertisement

 

 

 

 

Advertisement

 

Middle Level Commissioners chief executive Paul Burrows has responded to OFGEM by pointing out that the standing charge for St Germans Pumping Station has increased by 1282% from £3,915 to £54,140 a year. The winter has proved challenging for Middle Level.

Tags: HomepageMiddle Level CommissionersOFGEMPaul BurrowsSt Germans pumping stationstanding charge shock
ShareTweetSend
Next Post
News for Peterborough and Cambridgeshire - Police revealed the scene that met them on Sunday when called to a white van that crashed into the bridge at Ely station, Cambridgeshire.

Crash, bang, wallop as van comes out second best in Ely bridge ‘fail’

News for Peterborough and Cambridgeshire - Logan Cook, 22, (centre) jailed after ramming police vehicles (right) and putting lives at risk by failing to stop in Peterborough. His car is on the left.

Fleeing driver put ‘lives at risk’ ramming Cambridgeshire police vehicles

Help us by Donating

Latest News

News for Peterborough and Cambridgeshire -
News

Honey Akinola Wins Big: Anglia Ruskin Speak Out Challenge 2025

June 11, 2025
News for Peterborough and Cambridgeshire -
News

Government backs new pool for Peterborough

June 11, 2025
News for Peterborough and Cambridgeshire -
News

“All about taking control rather than the direction of travel”

June 11, 2025
News for Peterborough and Cambridgeshire -
News

“This Council has lost confidence in the current administration.”

June 11, 2025
News for Peterborough and Cambridgeshire -
News

Ralph Butcher Causeway: A Bridge Closed Longer Than It Has Been Open

June 9, 2025
News for Peterborough and Cambridgeshire -
News

What went wrong with the Ralph Butcher Causeway? Councillor Update.

June 9, 2025
News for Peterborough and Cambridgeshire - Paul Bristow awaiting result of the count in Peterborough. Photo: Terry Harris
News

Lifeline” Peterborough bus service threatened as Mayor refuses to rule out cuts 

June 5, 2025
News for Peterborough and Cambridgeshire -
News

Traffic chaos on Frank Perkins Parkway

June 3, 2025
  • Trending
  • Comments
  • Latest
News for Peterborough and Cambridgeshire -

What went wrong with the Ralph Butcher Causeway? Councillor Update.

June 9, 2025
News for Peterborough and Cambridgeshire -

“This Council has lost confidence in the current administration.”

June 11, 2025
News for Peterborough and Cambridgeshire -

Ralph Butcher Causeway: A Bridge Closed Longer Than It Has Been Open

June 9, 2025
News for Peterborough and Cambridgeshire -

Honey Akinola Wins Big: Anglia Ruskin Speak Out Challenge 2025

June 11, 2025
News for Peterborough and Cambridgeshire -

Honey Akinola Wins Big: Anglia Ruskin Speak Out Challenge 2025

0
News for Peterborough and Cambridgeshire -

Government backs new pool for Peterborough

0
News for Peterborough and Cambridgeshire -

“All about taking control rather than the direction of travel”

0
News for Peterborough and Cambridgeshire -

“This Council has lost confidence in the current administration.”

0
News for Peterborough and Cambridgeshire -

Honey Akinola Wins Big: Anglia Ruskin Speak Out Challenge 2025

June 11, 2025
News for Peterborough and Cambridgeshire -

Government backs new pool for Peterborough

June 11, 2025
News for Peterborough and Cambridgeshire -

“All about taking control rather than the direction of travel”

June 11, 2025
News for Peterborough and Cambridgeshire -

“This Council has lost confidence in the current administration.”

June 11, 2025

Follow us on Twitter

More News

News for Peterborough and Cambridgeshire -
News

Peterborough Regional Pool Nears Final Days as City Mulls Future Use of Site

June 2, 2025
News for Peterborough and Cambridgeshire -
News

Tragic Accident: 18-Year-Old Man Killed in Car-Bus Collision

June 2, 2025
News for Peterborough and Cambridgeshire -
News

UPDATE: Driver dies in A47 Guyhirn crash between car and double decker bus

June 1, 2025
News for Peterborough and Cambridgeshire -
News

Councillor Judy Fox elected as city Mayor for 25/26

May 19, 2025
News for Peterborough and Cambridgeshire -
News

Feel the Force Day Lights Up Peterborough Cathedral

May 17, 2025
News for Peterborough and Cambridgeshire -
News

Latest pictures as Demolition of Regional Pool Continues

May 16, 2025
  • News
  • Local Council
  • Investigations
  • Things To Do
  • Privacy Policy
  • Contact Us

© COPYRIGHT - UNIT 2 FENGATE TRADEPARK PETERBOROUGH PE15XB

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
We use cookies on our website to give you the most relevant experience by remembering your preferences and repeat visits. By clicking “Accept All”, you consent to the use of ALL the cookies. However, you may visit "Cookie Settings" to provide a controlled consent.
Cookie SettingsAccept All
Manage consent

Privacy Overview

This website uses cookies to improve your experience while you navigate through the website. Out of these, the cookies that are categorized as necessary are stored on your browser as they are essential for the working of basic functionalities of the website. We also use third-party cookies that help us analyze and understand how you use this website. These cookies will be stored in your browser only with your consent. You also have the option to opt-out of these cookies. But opting out of some of these cookies may affect your browsing experience.
Necessary
Always Enabled
Necessary cookies are absolutely essential for the website to function properly. These cookies ensure basic functionalities and security features of the website, anonymously.
CookieDurationDescription
cookielawinfo-checkbox-analytics11 monthsThis cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Analytics".
cookielawinfo-checkbox-functional11 monthsThe cookie is set by GDPR cookie consent to record the user consent for the cookies in the category "Functional".
cookielawinfo-checkbox-necessary11 monthsThis cookie is set by GDPR Cookie Consent plugin. The cookies is used to store the user consent for the cookies in the category "Necessary".
cookielawinfo-checkbox-others11 monthsThis cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Other.
cookielawinfo-checkbox-performance11 monthsThis cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Performance".
viewed_cookie_policy11 monthsThe cookie is set by the GDPR Cookie Consent plugin and is used to store whether or not user has consented to the use of cookies. It does not store any personal data.
Functional
Functional cookies help to perform certain functionalities like sharing the content of the website on social media platforms, collect feedbacks, and other third-party features.
Performance
Performance cookies are used to understand and analyze the key performance indexes of the website which helps in delivering a better user experience for the visitors.
Analytics
Analytical cookies are used to understand how visitors interact with the website. These cookies help provide information on metrics the number of visitors, bounce rate, traffic source, etc.
Advertisement
Advertisement cookies are used to provide visitors with relevant ads and marketing campaigns. These cookies track visitors across websites and collect information to provide customized ads.
Others
Other uncategorized cookies are those that are being analyzed and have not been classified into a category as yet.
SAVE & ACCEPT

Add New Playlist

No Result
View All Result
  • 360 Examples
  • Advertise with us
  • ARTICLE FOOTER NOT FOR PUBLICATION
  • Basket
  • Beer Festival VR 360
  • Buy Adspace
  • Cambridgeshire
  • Cancel donation
  • Cathedral Example 360
  • Cathedral Plan
  • Checkout
  • Checkout
  • Complaints
  • Contact Us
  • Cookie Policy
  • cookie-policy
  • Elementor #420
  • Hide Ads for Premium Members
  • Home
    • CambsNews Live
  • Latest News
  • Media Consent Form
  • Memorial Garden Example
  • My Account
  • My account
  • Notices
  • Notices Form
  • Privacy Policy
  • PU test
  • Sample Page
  • Sample Page
  • Shop
  • SiteMap
  • Submit Your News
  • Support our work.
  • test2
  • Thank you for your donation
  • Upload your ads

© COPYRIGHT - UNIT 2 FENGATE TRADEPARK PETERBOROUGH PE15XB

Are you sure want to unlock this post?
Unlock left : 0
Are you sure want to cancel subscription?