News for Peterborough and Cambridgeshire
  • Investigations
  • News
  • Crime
  • Your Views
No Result
View All Result
  • TRENDING:
  • Peterborough
  • Cambridge
  • Huntingdon
  • March
  • Wisbech
  • Ely
  • Fenland
  • Whittlesey
  • St Ives
Thursday, November 6, 2025
News for Peterborough and Cambridgeshire
  • Investigations
  • News
  • Crime
  • Your Views
No Result
View All Result
News for Peterborough and Cambridgeshire
Support Us
No Result
View All Result
  • Investigations
  • News
  • Crime
  • Your Views
Home News

1,280 per cent standing charge rise ‘punitively eyewatering’ says chief executive

John Elworthy by John Elworthy
10:13am, January 9 2024
in News
News for Peterborough and Cambridgeshire - Middle Level Commissioners chief executive Paul Burrows has responded to OFGEM by pointing out that the standing charge for St Germans Pumping Station has increased by 1282% from £3,915 to £54,140 a year. The winter has proved challenging for Middle Level.

Middle Level Commissioners chief executive Paul Burrows has responded to OFGEM by pointing out that the standing charge for St Germans Pumping Station has increased by 1282% from £3,915 to £54,140 a year. The winter has proved challenging for Middle Level.

Share on FacebookShare on Twitter

Chief executive Paul Burrows of the Middle Level Commissioners described increases in electricity standing charges as “punitively eyewatering”. The standing charge for St Germans Pumping Station, he says, has increased by 1,282% from £3,915 to £54,140.

“Across our portfolio of assets there are 67 electric meters and the standing charges have increased in total by 509% from £25,547 to £155,662 as a result of the Targeted Charging Review,” says Mr Burrows.

Middle Level Commissioners chief executive Paul Burrows has responded to OFGEM by pointing out that the standing charge for St Germans Pumping Station has increased by 1282% from £3,915 to £54,140 a year. The winter has proved challenging for Middle Level.
Middle Level Commissioners chief executive Paul Burrows has responded to OFGEM by pointing out that the standing charge for St Germans Pumping Station has increased by 1282% from £3,915 to £54,140 a year. The winter has proved challenging for Middle Level.

He has responded to OFGEM’s review of standing charges and claims “the Targeted Charging Review did not consider the bespoke needs and role of the Internal Drainage Board (IDB) sector within its concept and therefore its implementation has been unfair”.

The chief executive told OFGEM: “The dramatic step-change increase in standing charges has had to be borne by our ratepayers (i.e. farmers and land managers within the district who benefit from the pumping) and via special levies on district councils within these areas.

“The latter is passed on to residents via Council Tax creating additional financial burdens on Council-delivered critical public services.”

“Electricity costs form a significant proportion of IDBs’ overall revenue expenditure, therefore the impact of the Targeted Charging Review, if it continues, will have a disproportionate impact on our public service objectives and place people, businesses and critical infrastructure at greater flood risk, increasing the risk to life and livelihoods.”

Middle Level Commissioners chief executive Paul Burrows has responded to OFGEM by pointing out that the standing charge for St Germans Pumping Station has increased by 1282% from £3,915 to £54,140 a year. The winter has proved challenging for Middle Level.
Middle Level Commissioners chief executive Paul Burrows has responded to OFGEM by pointing out that the standing charge for St Germans Pumping Station has increased by 1282% from £3,915 to £54,140 a year. The winter has proved challenging for Middle Level.

Middle Level is responsible for 190km of embanked watercourses, 160km of which are statutory navigations, and two major pumping stations.

This system moves excess water from the lowest land in the country into the Tidal River Great Ouse via St Germans Pumping Station. The current pumping station, opened in April 2010, is the largest of its type in the UK, with a maximum pumping capacity of 100 cubic metres.

Following Storm Henk in early January St Germans Pumping Station reached a record volume of 77 cumecs of water being pumped (100 cumec max capability).

Middle Level Commissioners chief executive Paul Burrows has responded to OFGEM by pointing out that the standing charge for St Germans Pumping Station has increased by 1282% from £3,915 to £54,140 a year. The winter has proved challenging for Middle Level.
Middle Level Commissioners chief executive Paul Burrows has responded to OFGEM by pointing out that the standing charge for St Germans Pumping Station has increased by 1282% from £3,915 to £54,140 a year. The winter has proved challenging for Middle Level.

Middle Level provides flood protection to more than 8,000 homes, at least 1,600 commercial properties, 57,000 hectares of farmland and vital road, rail, and power infrastructure.

Mr Burrows said: “This winter is likely to prove a record breaking one for land drainage pumping here in the Fens with record volumes already having been pumped at our St Germans Pumping Station.

“We provide a critical public service that not only protects lives and livelihoods from flooding, but also protects key gas and electricity supply infrastructure.”

Middle Level Commissioners chief executive Paul Burrows has responded to OFGEM by pointing out that the standing charge for St Germans Pumping Station has increased by 1282% from £3,915 to £54,140 a year. The winter has proved challenging for Middle Level.
Middle Level Commissioners chief executive Paul Burrows has responded to OFGEM by pointing out that the standing charge for St Germans Pumping Station has increased by 1282% from £3,915 to £54,140 a year. The winter has proved challenging for Middle Level.

He added: “The costs of pumping are substantial, and the increases we have seen to standing charges over the last 12-month have been punitively eyewatering.

“I urge Government and OFGEM to reconsider their approach to our sector.”

Middle Level Commissioners administer 29 smaller IDBs (jnternal drainage boards) and 24 of which have electric powered pumping stations.

Middle Level Commissioners chief executive Paul Burrows has responded to OFGEM by pointing out that the standing charge for St Germans Pumping Station has increased by 1282% from £3,915 to £54,140 a year. The winter has proved challenging for Middle Level.
Middle Level Commissioners chief executive Paul Burrows has responded to OFGEM by pointing out that the standing charge for St Germans Pumping Station has increased by 1282% from £3,915 to £54,140 a year. The winter has proved challenging for Middle Level.

If you’d like to understand more about how the Middle and South Levels of the Fens works within the Great Ouse catchment, then we’d recommend taking a read of the following publication.

https://www.ada.org.uk/…/Future-Fens-Flood-Risk…

 

Here is the full text of the letter from PAUL BURROWS, chief executive of Middle Level Commissioners, to OFGEM

We welcome OFGEM’s call for input into its review of standing charges. We feel that the Targeted Charging Review did not consider the bespoke needs and role of the Internal Drainage Board (IDB) sector within its concept and therefore its implementation has been unfair.

Indeed, the scope of this review feels biased towards domestic customers, therefore our response is a more general one rather than answering specific questions posed within your consultation.

For more information about the IDB sector please refer to the Association of Drainage Authorities (ADA). Who are we and what do we do?

We are a public authority who protect a large area of the Cambridgeshire and Norfolk Fens from flooding via river embankments, water control structures and pumping stations.

The area is low-lying and below sea level, with some areas of land needing to be pumped three times before rainfall is safely evacuated to sea.

Middle Level Commissioners chief executive Paul Burrows has responded to OFGEM by pointing out that the standing charge for St Germans Pumping Station has increased by 1282% from £3,915 to £54,140 a year. The winter has proved challenging for Middle Level.
Middle Level Commissioners chief executive Paul Burrows has responded to OFGEM by pointing out that the standing charge for St Germans Pumping Station has increased by 1282% from £3,915 to £54,140 a year. The winter has proved challenging for Middle Level.

Here at the Middle Level Commissioners, we administer 29 smaller IDBs and 24 of which have electric powered pumping stations.

We also own and operate St Germans Pumping Station, the largest land drainage pumping station in the UK.

Across our portfolio of assets there are 67 electric meters and the standing charges have increased in total by 509% from £25,547 to £155,662 as a result of the Targeted Charging Review.

The standing charge for St Germans Pumping Station has increased by 1282% from £3,915 to £54,140 and currently only circa 50% of the station’s maximum capacity is served by the grid.

The electricity baseload needs of our assets is relatively low but the maximum capacity we need in times of flood concern is high, with the duration that we need high capacity being relatively short. Our needs are entirely dependent upon the weather and this winter is already proving likely to be a record breaking one for pumping.

Following Storm Henk in early January St Germans Pumping Station reached a record volume of 77 cumecs of water being pumped (100 cumec max capability).

Middle Level Commissioners chief executive Paul Burrows has responded to OFGEM by pointing out that the standing charge for St Germans Pumping Station has increased by 1282% from £3,915 to £54,140 a year. The winter has proved challenging for Middle Level.
Middle Level Commissioners chief executive Paul Burrows has responded to OFGEM by pointing out that the standing charge for St Germans Pumping Station has increased by 1282% from £3,915 to £54,140 a year. The winter has proved challenging for Middle Level.

What are the financial benefits to the electricity sector within the Middle Level?

We estimate that IDB and Environment Agency flood infrastructure within the Middle Level currently avoids £275million of damages to the electricity utility assets. This loss is calculated for damages to electricity generation and distribution assets within the Middle Level of the Great Ouse Fens.

The losses are calculated only where the infrastructure would be permanently lost to flooding. Source: Future Fens Flood Risk Management, Baseline Report (see pages 102, 106, 116) Proudly managing water levels in the Fens since 1862 www.middlelevel.gov.uk How are we funded?

The dramatic step-change increase in standing charges has had to be borne by our ratepayers (i.e. farmers and land managers within the district who benefit from the pumping) and via special levies on District Councils within these areas.

The latter is passed on to residents via Council Tax creating additional financial burdens on Council-delivered critical public services.

Middle Level Commissioners chief executive Paul Burrows has responded to OFGEM by pointing out that the standing charge for St Germans Pumping Station has increased by 1282% from £3,915 to £54,140 a year. The winter has proved challenging for Middle Level.
Middle Level Commissioners chief executive Paul Burrows has responded to OFGEM by pointing out that the standing charge for St Germans Pumping Station has increased by 1282% from £3,915 to £54,140 a year. The winter has proved challenging for Middle Level.

Electricity costs form a significant proportion of IDBs’ overall revenue expenditure, therefore the impact of the Targeted Charging Review, if it continues, will have a disproportionate impact on our public service objectives and place people, businesses, and critical infrastructure at greater flood risk, increasing the risk to life and livelihoods.

Net Zero There are also a small number of diesel-powered pumping stations within the Middle Level that are coming to the end of their design life, along with many stations that use a combination of diesel and electricity.

Schemes to address most of these are within the Government’s Flood & Coastal Erosion Investment Programme funded by Defra via the Environment Agency.

The step-change increase in standing charges has resulted in IDBs being cautious about progressing these much-needed improvements to their assets at a time when Government is looking for delivery authorities to accelerate schemes to improve the nation’s flood resilience.

Middle Level Commissioners chief executive Paul Burrows has responded to OFGEM by pointing out that the standing charge for St Germans Pumping Station has increased by 1282% from £3,915 to £54,140 a year. The winter has proved challenging for Middle Level.
Middle Level Commissioners chief executive Paul Burrows has responded to OFGEM by pointing out that the standing charge for St Germans Pumping Station has increased by 1282% from £3,915 to £54,140 a year. The winter has proved challenging for Middle Level.

Why do we feel the Targeted Charging Review has been unfairly applied to our sector?

1 We were not abusers of the previous charging system and have become a victim of the new system.

2 The critical public service role of Internal Drainage Boards has not been considered, understood, and catered for within the changes that have been applied. We are not commercial profit-making businesses.

Advertisement
Advertisements
canopyuk.com in-article

3 IDBs cover about 10% of England so the impact of this unfairly penalises people and businesses within lowland areas compared to the remaining 90% of the country. Fenland is also relatively deprived, magnifying the unfairness.

4 Our pumping stations and other infrastructure provides flood protection to the electricity sector (and to its customers), and this has a financial benefit to the sector. The sector makes no financial contribution to IDBs for the flood protection services we provide. This is grossly unfair.

What are we asking of OFGEM? Defra is the government policy lead for Internal Drainage Boards, and we ask that OFGEM work with the Department for Energy Security & Net Zero (DESNZ) and Defra to:

1) Agree an exception case for our sector, and

2) Agree a framework whereby the energy sector financially contributes to relevant revenue and capital expenditure of IDBs where the a) IDB’s infrastructure provides flood protection to energy sector assets and b) there is a residual need to move from diesel to electricity driven pumping.

Paul Burrows Chief Executive, Middle Level Commissioners chiefofficers@middlelevel.gov.uk

January 2024

(Proudly managing water levels in the Fens since 1862 www.middlelevel.gov.uk )

On behalf of the following twenty-five public authorities:

Middle Level Commissioners

 Benwick Internal Drainage Board

 Conington & Holme Internal Drainage Board

 Curf & Wimblington Combined Internal Drainage Board

Euximoor Internal Drainage Board

Haddenham Level Drainage Commissioners

Manea & Welney District Commissioners

March East Internal Drainage Board

March 5th District Drainage Commissioners

 March 6th District Drainage Commissioners

March 3rd District Drainage Commissioners

March West & White Fen Internal Drainage Board

 Nightlayers Internal Drainage Board

Nordelph Internal Drainage Board

Over & Willingham Internal Drainage Board

Ramsey First (Hollow) Internal Drainage Board

Ramsey Fourth (Middlemoor) Internal Drainage Board

Ramsey Upwood & Great Raveley Internal Drainage Board

 Ransonmoor Drainage Commissioners

Sawtry Internal Drainage Board

Sutton & Mepal Internal Drainage Board

Swavesey Internal Drainage Board

Upwell Internal Drainage Board

Waldersey Internal Drainage Board

Warboys, Somersham & Pidley Internal Drainage Board

 

 

 

 

 

 

Middle Level Commissioners chief executive Paul Burrows has responded to OFGEM by pointing out that the standing charge for St Germans Pumping Station has increased by 1282% from £3,915 to £54,140 a year. The winter has proved challenging for Middle Level.

Tags: HomepageMiddle Level CommissionersOFGEMPaul BurrowsSt Germans pumping stationstanding charge shock
ShareTweetSend
Next Post
News for Peterborough and Cambridgeshire - Police revealed the scene that met them on Sunday when called to a white van that crashed into the bridge at Ely station, Cambridgeshire.

Crash, bang, wallop as van comes out second best in Ely bridge ‘fail’

News for Peterborough and Cambridgeshire - Logan Cook, 22, (centre) jailed after ramming police vehicles (right) and putting lives at risk by failing to stop in Peterborough. His car is on the left.

Fleeing driver put ‘lives at risk’ ramming Cambridgeshire police vehicles

Help us by Donating

Latest News

News for Peterborough and Cambridgeshire - Cambridge Jazz Festival (9-23 Nov) is returning for its 11th edition – with 40 events, 15 venues, and, say organisers, “a lineup that blends legends, future stars, and global talent.” PHOTO: Stella Cole by Shervin Lainez
News

Courtney Pine and Tanita Tikaram lead a star-studded Cambridge Jazz Festival

November 6, 2025
News for Peterborough and Cambridgeshire - A 32-year-old man is the sole suspect in a stabbing on a Doncaster–London train Saturday evening. An LNER staff member who tried to stop the attack remains in life-threatening condition, while five others have been discharged. British Transport Police praised the worker’s “heroic” actions, saying they saved lives. Armed officers boarded the diverted 18:25 service to Huntingdon after passenger calls at 19:40 GMT. IMAGE: Terry Harris
News

Lib Dems lead George Cross campaign for Huntingdon train heroes

November 6, 2025
News for Peterborough and Cambridgeshire - Animal Rising has released multiple images from their campaign at MBR Acres, Wyton, Cambridgeshire. Animal Rising describes itself as a social movement to create a new relationship “with all beings and give us a chance for a safe ecological future”
News

Cambridgeshire trial to spotlight MBR Acres beagle rescue

November 6, 2025
News for Peterborough and Cambridgeshire - RSPCA Inspector Dean Astillberry who investigated the case said after the hearing: “As an RSPCA Inspector with 30 years experience it is clear to me that these dogs were living in circumstances that were likely to cause them suffering
News

Cruelty uncovered: Ramsey couple jailed after six starving pets found in filthy home

November 6, 2025
News for Peterborough and Cambridgeshire - East Cambridgeshire Council’s reservoir plan promises homes, jobs, and environmental gains Local reservoirs: the key to Cambridgeshire’s water security and growth East Cambridgeshire is at a crossroads. As climate change intensifies and the region’s population grows, the challenge of securing a reliable water supply has become urgent. A new report commissioned by the East Cambridgeshire District Council, prepared by the Eastern Powerhouse, lays out a bold vision: a network of local agricultural reservoirs, integrated with existing drainage infrastructure, to provide water resilience and unlock sustainable growth for the region. A pressing challenge Water security is not a distant concern for East Cambridgeshire. “It is a present and pressing issue that directly affects our ability to grow sustainably and provide the homes, jobs, and environment our communities deserve,” writes Cllr Anna Bailey, Leader of East Cambridgeshire District Council, in the report’s foreword. The proposal to create a local network of reservoirs is described as “a transformative opportunity” that could turn flood risk into a vital resource by capturing surplus winter flows and storing water for use during dry summer months. This approach, the report argues, would not only reduce pressure on drainage systems during heavy rainfall but also ensure a steady supply for homes, businesses, and agriculture when it is most needed. “It creates opportunities to restore wetlands, rewet peat soils, and enhance habitats for wildlife, making our water system part of a wider effort to recover biodiversity,” the report states. Climate risks and economic stakes East Cambridgeshire, situated within the South Level of the Fens—the UK’s largest coastal wetland—is highly exposed to climate-related risks. Rising sea levels, more frequent heavy rainfall, higher temperatures, and prolonged droughts threaten the region. The Fens have already experienced damaging events, including the tidal surge of 2013 and the drought of 2018. In 2022, a hot, dry summer caused water shortages. The report notes that “with adequate supply of water, the hotter weather will make the region’s agricultural sector more productive, representing an economic opportunity.” However, uncertainty over long-term water supply is creating a bottleneck for housing and inward investment, with major developments stalled due to concerns over water scarcity. The national and regional water challenge The East of England is one of the most water-stressed areas in the UK. Over-extraction from chalk aquifers and river systems threatens both ecosystems and long-term public supply. The region faces a projected water shortage of 800 million litres per day by 2050—about one third of current use. Yet, as the report points out, “the problem is not a lack of water,” but rather the capacity to store it and the ability of existing systems to respond dynamically to growth. Three major rivers—the Nene, the Ouse, and the Cam—deliver substantial excess water during the winter months. “Significant efforts have to be made in the region to pump excess water out into the North Sea, at great cost to Fenland farmers and taxpayers, only then to restrict water supplies for all users during the summer,” the report explains. The limits of centralised infrastructure While major infrastructure projects are in development, such as the proposed new reservoir near Chatteris, these solutions are years away. The Chatteris reservoir, led by Anglian Water, is projected to cost £2.2 billion and may not be completed before 2036. In the meantime, constrained supply is already halting or delaying new housing developments in Cambridgeshire. The report criticises the current regulatory system, which is “centred on 5 year price review periods,” for stifling innovation and leaving little room for place-based solutions. “Without reform, the system will continue to act as a brake on regional development,” it warns. A local solution: agricultural reservoirs The heart of the report’s proposal is a network of agricultural reservoirs, supported by local farmers and landowners, to supply incremental water demand until major infrastructure is delivered. There are already over 80 agricultural reservoirs across the district, with just seven farmers holding 5.4 million cubic metres of water in 24 mid-sized reservoirs—equivalent to 10% of the planned capacity at Chatteris. [ A recent technical study suggests that seven new mid-sized agricultural reservoirs could store 6 to 7 million cubic metres of water and could be built in under three years at a cost of £2–3 million each. The report highlights the cost-effectiveness: “A network of agricultural reservoirs would cost £4 to £5 per cubic metre of water compared with £40 per cubic metre from Chatteris.” Each reservoir, at 85% utilisation, could provide water for 7,000 people a year. Combined with demand reduction measures and interim supply from Grafham Water, this could meet projected housing growth over the next 15 years. Creating a local water market The development of agricultural reservoirs would also create a new “water market,” stimulating trade in water between farmers and into the local supply network. This would provide additional income for farmers and Internal Drainage Boards (IDBs), helping to stimulate the wider East Cambridgeshire economy. The report calls for public-private finance arrangements to share costs, risks, and rewards. A new water treatment works at Waterbeach is identified as a key component, with estimated costs ranging from £40 million to over £200 million, depending on scale. The report notes, “This is still a relatively small sum in the context of sustaining the continued growth of Greater Cambridge.” Reforming regulation and governance The report is critical of the current regulatory framework, which it describes as fragmented and siloed. It calls for “a system that is more accountable, transparent, and responsive to place-based needs,” including legislative changes to empower IDBs and give local authorities a stronger voice in water planning. A new Cambridgeshire and Peterborough Water and Growth Board is proposed to coordinate water infrastructure planning and delivery, bringing together water companies, regulators, local authorities, and community representatives. Conclusion: a call to action The report concludes that “the water crisis facing the East of England is not only a constraint but an opportunity.” By piloting new models of local water management, East Cambridgeshire can accelerate delivery and enhance sustainability. The council commits to supporting the development of agricultural reservoirs as part of its corporate strategy to address water scarcity and unlock growth. The recommendations are clear: continue to promote sustainable water management, support the development of agricultural reservoirs, work with regional partners to fund feasibility studies, and promote this model as a national pilot. For government, the report urges piloting water market reform, amending legislation to empower IDBs, and expanding the statutory role of local authorities in strategic water planning. As the report states, “East Cambridgeshire is well-positioned to lead by example, showing how local leadership, when empowered, can drive sustainable transformation.” All information and quotes sourced from the East Cambridgeshire District Council’s July 2025 report, “A network of local reservoirs: Providing water resilience and security to unlock growth in the region.” Here are the key benefits of agricultural reservoirs, as outlined in the East Cambridgeshire District Council report: • Fast delivery: Can be designed, approved, and built within three years. • Cost-effective: £4–£5 per cubic metre of water, compared to £40 per cubic metre for large-scale reservoirs. • Flexible and scalable: Can be expanded incrementally to match local housing and employment growth. • Environmental benefits: Supports peatland rewetting, wetland restoration, and biodiversity; reduces carbon emissions by using gravity-fed systems. • Improved drought and flood resilience: Stores surplus winter water for use in dry months and reduces flood risk by easing pressure on drainage systems. • Economic boost: Provides extra income for farmers and Internal Drainage Boards through water trading; supports local agricultural productivity. • Unlocks housing and development: Ensures a reliable water supply, enabling new homes and jobs. • Local control and innovation: Empowers local authorities, farmers, and landowners to manage water resources and encourages innovative, place-based solutions. ‘East Cambridgeshire is ready to lead. This report is our call to action, for government, regulators, and partners across the region to join us in turning a local solution into a national exemplar’ Cllr Anna Bailey Leader, East Cambridgeshire District Council
East Cambridgeshire District Council

East Cambridgeshire Council’s reservoir plan promises homes, jobs, and environmental gains

November 6, 2025
News for Peterborough and Cambridgeshire - The independent charity, Crimestoppers is offering a reward of up to £20, 000 for information that leads to the conviction of those responsible for the murder of Hamid ‘Mick’ Tawaab in Huntingdon earlier this year.
Crime

£20,000 reward to help solve murder of Hamid ‘Mick’ Tawaab in Huntingdon

November 6, 2025
News for Peterborough and Cambridgeshire - The home, in Lincoln Road, Peterborough, had several hazards including extensive damp and mould, poor thermal insulation, improper fire evacuation measures and dangerous electrics.
News

No show at court as Peterborough letting firm fined for leaving tenants in unsafe conditions

November 5, 2025
News for Peterborough and Cambridgeshire - Bus services across Cambridgeshire are facing a standstill as 350 Stagecoach workers ballot for strike action over pay, Unite, the UK’s leading union, said today
News

Cambridgeshire faces bus standstill as Stagecoach workers ballot for strike action

November 4, 2025
  • Trending
  • Comments
  • Latest
News for Peterborough and Cambridgeshire -

Armed police storm train at Huntingdon after horrific stabbing rampage

November 2, 2025
News for Peterborough and Cambridgeshire -

Firefighters tackle garage blaze in Peterborough

October 30, 2025
News for Peterborough and Cambridgeshire - Whittlesey’s Manor Leisure Centre is set to undergo a multi-million-pound redevelopment, with the spotlight on costs, financial sustainability, and the addition of a commercial kitchen and café—a feature designed to make the centre a true hub for the community.

Transformation of Manor Leisure Centre Whittlesey could cost nearly £19m

November 3, 2025
News for Peterborough and Cambridgeshire - Hamid Tawaab, 59, (above) was found unconscious in his flat in Fern Court on the afternoon of 20 January and was pronounced dead at the scene shortly after.

Murder shock: 17-year-old held over man’s death in Huntingdon

October 31, 2025
News for Peterborough and Cambridgeshire - Cambridge Jazz Festival (9-23 Nov) is returning for its 11th edition – with 40 events, 15 venues, and, say organisers, “a lineup that blends legends, future stars, and global talent.” PHOTO: Stella Cole by Shervin Lainez

Courtney Pine and Tanita Tikaram lead a star-studded Cambridge Jazz Festival

0
News for Peterborough and Cambridgeshire - A 32-year-old man is the sole suspect in a stabbing on a Doncaster–London train Saturday evening. An LNER staff member who tried to stop the attack remains in life-threatening condition, while five others have been discharged. British Transport Police praised the worker’s “heroic” actions, saying they saved lives. Armed officers boarded the diverted 18:25 service to Huntingdon after passenger calls at 19:40 GMT. IMAGE: Terry Harris

Lib Dems lead George Cross campaign for Huntingdon train heroes

0
News for Peterborough and Cambridgeshire - Animal Rising has released multiple images from their campaign at MBR Acres, Wyton, Cambridgeshire. Animal Rising describes itself as a social movement to create a new relationship “with all beings and give us a chance for a safe ecological future”

Cambridgeshire trial to spotlight MBR Acres beagle rescue

0
News for Peterborough and Cambridgeshire - RSPCA Inspector Dean Astillberry who investigated the case said after the hearing: “As an RSPCA Inspector with 30 years experience it is clear to me that these dogs were living in circumstances that were likely to cause them suffering

Cruelty uncovered: Ramsey couple jailed after six starving pets found in filthy home

0
News for Peterborough and Cambridgeshire - Cambridge Jazz Festival (9-23 Nov) is returning for its 11th edition – with 40 events, 15 venues, and, say organisers, “a lineup that blends legends, future stars, and global talent.” PHOTO: Stella Cole by Shervin Lainez

Courtney Pine and Tanita Tikaram lead a star-studded Cambridge Jazz Festival

November 6, 2025
News for Peterborough and Cambridgeshire - A 32-year-old man is the sole suspect in a stabbing on a Doncaster–London train Saturday evening. An LNER staff member who tried to stop the attack remains in life-threatening condition, while five others have been discharged. British Transport Police praised the worker’s “heroic” actions, saying they saved lives. Armed officers boarded the diverted 18:25 service to Huntingdon after passenger calls at 19:40 GMT. IMAGE: Terry Harris

Lib Dems lead George Cross campaign for Huntingdon train heroes

November 6, 2025
News for Peterborough and Cambridgeshire - Animal Rising has released multiple images from their campaign at MBR Acres, Wyton, Cambridgeshire. Animal Rising describes itself as a social movement to create a new relationship “with all beings and give us a chance for a safe ecological future”

Cambridgeshire trial to spotlight MBR Acres beagle rescue

November 6, 2025
News for Peterborough and Cambridgeshire - RSPCA Inspector Dean Astillberry who investigated the case said after the hearing: “As an RSPCA Inspector with 30 years experience it is clear to me that these dogs were living in circumstances that were likely to cause them suffering

Cruelty uncovered: Ramsey couple jailed after six starving pets found in filthy home

November 6, 2025

Follow us on Twitter

More News

News for Peterborough and Cambridgeshire - MP Ben Obese-Jecty has been widely commended for his visible support of emergency services during Saturday’s attack at Huntingdon Station, and for keeping constituents updated throughout the weekend. Above: Speaking in Parliament on Monday
News

Cambridgeshire MP condemns ‘unfair’ criticism of police after Huntingdon train attack

November 4, 2025
News for Peterborough and Cambridgeshire - Jason O’Dell, who had just served a nine-year sentence for rape, turned up at a family member’s home in Longstanton at about 5.30pm on 17 February this year
Crime

Rapist threatened to kill man hours after release from prison

November 3, 2025
News for Peterborough and Cambridgeshire - Knowles: The worker was loading sugar beet for transport when the conveyor became blocked. Attempting to clear the obstruction by climbing the side of the machinery, the employee fell and sustained multiple broken ribs, a punctured lung, and liver damage.
News

Cambridgeshire logistics firm fined £133,000 after worker plunges from conveyor

November 3, 2025
News for Peterborough and Cambridgeshire - A man who fraudulently claimed to be homeless to secure Council housing - while renting his privately owned property for financial gain – appeared in court to hear the outcome of an investigation under the Proceeds of Crime Act.
News

Raymond Brown must repay South Cambridgeshire District Council after housing scam

November 3, 2025
News for Peterborough and Cambridgeshire - Scene at Huntingdon station last night
News

Peterborough man charged after Cambridgeshire train attack

November 3, 2025
News for Peterborough and Cambridgeshire - Whittlesey’s Manor Leisure Centre is set to undergo a multi-million-pound redevelopment, with the spotlight on costs, financial sustainability, and the addition of a commercial kitchen and café—a feature designed to make the centre a true hub for the community.
Fenland District Council

Transformation of Manor Leisure Centre Whittlesey could cost nearly £19m

November 3, 2025
  • News
  • Local Council
  • Investigations
  • Things To Do
  • About
  • Privacy Policy
  • Contact Us

© COPYRIGHT - UNIT 2 FENGATE TRADEPARK PETERBOROUGH PE15XB

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
We use cookies on our website to give you the most relevant experience by remembering your preferences and repeat visits. By clicking “Accept All”, you consent to the use of ALL the cookies. However, you may visit "Cookie Settings" to provide a controlled consent.
Cookie SettingsAccept All
Manage consent

Privacy Overview

This website uses cookies to improve your experience while you navigate through the website. Out of these, the cookies that are categorized as necessary are stored on your browser as they are essential for the working of basic functionalities of the website. We also use third-party cookies that help us analyze and understand how you use this website. These cookies will be stored in your browser only with your consent. You also have the option to opt-out of these cookies. But opting out of some of these cookies may affect your browsing experience.
Necessary
Always Enabled
Necessary cookies are absolutely essential for the website to function properly. These cookies ensure basic functionalities and security features of the website, anonymously.
CookieDurationDescription
cookielawinfo-checkbox-analytics11 monthsThis cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Analytics".
cookielawinfo-checkbox-functional11 monthsThe cookie is set by GDPR cookie consent to record the user consent for the cookies in the category "Functional".
cookielawinfo-checkbox-necessary11 monthsThis cookie is set by GDPR Cookie Consent plugin. The cookies is used to store the user consent for the cookies in the category "Necessary".
cookielawinfo-checkbox-others11 monthsThis cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Other.
cookielawinfo-checkbox-performance11 monthsThis cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Performance".
viewed_cookie_policy11 monthsThe cookie is set by the GDPR Cookie Consent plugin and is used to store whether or not user has consented to the use of cookies. It does not store any personal data.
Functional
Functional cookies help to perform certain functionalities like sharing the content of the website on social media platforms, collect feedbacks, and other third-party features.
Performance
Performance cookies are used to understand and analyze the key performance indexes of the website which helps in delivering a better user experience for the visitors.
Analytics
Analytical cookies are used to understand how visitors interact with the website. These cookies help provide information on metrics the number of visitors, bounce rate, traffic source, etc.
Advertisement
Advertisement cookies are used to provide visitors with relevant ads and marketing campaigns. These cookies track visitors across websites and collect information to provide customized ads.
Others
Other uncategorized cookies are those that are being analyzed and have not been classified into a category as yet.
SAVE & ACCEPT

Add New Playlist

No Result
View All Result
  • 360 Examples
  • About
  • Advertise with us
  • ARTICLE FOOTER NOT FOR PUBLICATION
  • Basket
  • Beer Festival VR 360
  • Buy Adspace
  • Cambridgeshire
  • Cancel donation
  • Cathedral Example 360
  • Cathedral Plan
  • Checkout
  • Checkout
  • Civic Dash
  • Complaints
  • Contact Us
  • Cookie Policy
  • cookie-policy
  • crm
  • Elementor #420
  • Hide Ads for Premium Members
  • Home
    • CambsNews Live
  • Latest News
  • Media Consent Form
  • Memorial Garden Example
  • My Account
  • My account
  • Notices
  • Notices Form
  • Privacy Policy
  • PU test
  • Sample Page
  • Sample Page
  • Shop
  • SiteMap
  • Submit Your News
  • Support our work.
  • test2
  • Thank you for your donation
  • Upload your ads

© COPYRIGHT - UNIT 2 FENGATE TRADEPARK PETERBOROUGH PE15XB