News for Peterborough and Cambridgeshire
  • Investigations
  • News
  • Crime
  • Your Views
No Result
View All Result
  • TRENDING:
  • Peterborough
  • Cambridge
  • Huntingdon
  • March
  • Wisbech
  • Ely
  • Fenland
  • Whittlesey
  • St Ives
Saturday, October 18, 2025
News for Peterborough and Cambridgeshire
  • Investigations
  • News
  • Crime
  • Your Views
No Result
View All Result
News for Peterborough and Cambridgeshire
Support Us
No Result
View All Result
  • Investigations
  • News
  • Crime
  • Your Views
Home News

Council tries to keep façade of fire ravaged Wisbech Cashino slots store

John Elworthy by John Elworthy
1:10pm, August 17 2023
in News
News for Peterborough and Cambridgeshire - Photo doing the rounds of social media of youngsters using the scaffold at Cashino burnt out Wisbech store for climbing practice.

Photo doing the rounds of social media of youngsters using the scaffold at Cashino burnt out Wisbech store for climbing practice.

Share on FacebookShare on Twitter

A bid to resolve the impasse over the future of a fire damaged historic building in the centre of Wisbech will involve changing a planning application to partial demolition.

Fenland District Council has revealed the outcome of a meeting with architects and advisers of the former Cashino slots store at 5 Market Place.

An application to demolish what is left of 5 Market Place Wisbech is before Fenland District Council. It was destroyed by fire more than a year ago.
An application to demolish what is left of 5 Market Place Wisbech is before Fenland District Council. It was destroyed by fire more than a year ago.

Danielle Brooke, the council’s senior development manager, says it was apparent from the meeting “that the structural engineers feel that the front façade may be able to be retained and repaired, which is the preference of FDC and Historic England”.

Historic England had earlier thrown a gigantic spanner in the works to early hopes of the building being demolished any time soon.

It says “no clear and convincing justification has been provided” to support the level of demolition and rebuilding proposed.

An application to demolish what is left of 5 Market Place Wisbech is before Fenland District Council. It was destroyed by fire more than a year ago.
An application to demolish what is left of 5 Market Place Wisbech is before Fenland District Council. It was destroyed by fire more than a year ago. PHOTO: John Elworthy

Historic England -the government’s statutory adviser – wants more evidence to justify demolition.

Ms Brooke has given the owners until the end of September to get their ducks in a row prior to the council being able to decide the best way forward.

Photo doing the rounds of social media of youngsters using the scaffold at Cashino burnt out Wisbech store for climbing practice.
Photo doing the rounds of social media of youngsters using the scaffold at Cashino burnt out Wisbech store for climbing practice.

She says that following the recent meeting, the council feels that the applications for demolition should be changed to “partial demolition of a fire damaged listed building.

“It was considered that the heritage significance assessment, planning statement, and written scheme of investigation appeared to be comprehensive and appropriate to the proposals with a clear intention to a sympathetic approach to the works, respecting the heritage of the building.

 

An application to demolish what is left of 5 Market Place Wisbech is before Fenland District Council. It was destroyed by fire more than a year ago.
An application to demolish what is left of 5 Market Place Wisbech is before Fenland District Council. It was destroyed by fire more than a year ago.

“However, there are some discrepancies in these documents with some stating that the front façade will be demolished whilst others state this will be retained”.

Ms Brooke says that it was apparent from the meeting “that the structural engineers feel that the front façade may be able to be retained and repaired, which is the preference of FDC and Historic England.

An application to demolish what is left of 5 Market Place Wisbech is before Fenland District Council. It was destroyed by fire more than a year ago.
An application to demolish what is left of 5 Market Place Wisbech is before Fenland District Council. It was destroyed by fire more than a year ago.

“As such, where referenced and without evidence to the contrary, it should be intended to retain the front façade this should be made clear throughout all the documentation.

“It is evident that there are three clear sections to the building, with the most significant damage in the rearmost section, and that it will be necessary to work from the rear of the site towards the front.”

Ms Brooke says the rearmost section will likely need the most significant clearance/material removal, and it is unlikely there will be much salvageable material in this part.

An application to demolish what is left of 5 Market Place Wisbech is before Fenland District Council. It was destroyed by fire more than a year ago.
An application to demolish what is left of 5 Market Place Wisbech is before Fenland District Council. It was destroyed by fire more than a year ago.

“However, it is acknowledged that this section will need to be fully cleared and made safe to enable further investigation further into the building,” she says.

“It is recommended therefore that the application and works be considered as a three-phase approach, with an iterative approach being taken in respect of the latter two phases.”

The council’s suggested plan is:

An application to demolish what is left of 5 Market Place Wisbech is before Fenland District Council. It was destroyed by fire more than a year ago.
An application to demolish what is left of 5 Market Place Wisbech is before Fenland District Council. It was destroyed by fire more than a year ago.

The rearmost section will be Phase 1, and the clearance will enable an informed decision to be made about the scope and extent of demotion works in the middle section (Phase 2.

And then, finally the extent of demolition, retention, and repair (where practicable) of the front section and façade (Phase 3).

An application to demolish what is left of 5 Market Place Wisbech is before Fenland District Council. It was destroyed by fire more than a year ago.
An application to demolish what is left of 5 Market Place Wisbech is before Fenland District Council. It was destroyed by fire more than a year ago.

“The submitted documents should all align with this phasing,” says the development officer.

“The demolition method statement as submitted, whilst perfectly appropriate as a matter of principle about how one should go about demolishing a building, needs the input of your structural engineer and conservationist so that it brings together these three elements.

An application to demolish what is left of 5 Market Place Wisbech is before Fenland District Council. It was destroyed by fire more than a year ago.
An application to demolish what is left of 5 Market Place Wisbech is before Fenland District Council. It was destroyed by fire more than a year ago.

“At present the demolition statement is at odds with the content of the other documents.

“The method statement (and associated drawings) will need to clearly outline the phased demolition/retention/repair (as appropriate) of each section of the building, with details of how any usable material will be salvaged and stored to eventually be reinstated.”

An application to demolish what is left of 5 Market Place Wisbech is before Fenland District Council. It was destroyed by fire more than a year ago.
An application to demolish what is left of 5 Market Place Wisbech is before Fenland District Council. It was destroyed by fire more than a year ago.

She says that should the applications be approved; they will likely include conditions for further information and reporting (including for example updated structural reports and method statements) to be submitted and approved before the next phase of dismantling can commence.

Fenland Council and the heritage consultees, she says, will wish to retain some semblance of control over the process as new information comes to light as the works progress.

Once the council has revised documents, there will a further consultation prior to a decision being made.

An application to demolish what is left of 5 Market Place Wisbech is before Fenland District Council. It was destroyed by fire more than a year ago.
An application to demolish what is left of 5 Market Place Wisbech is before Fenland District Council. It was destroyed by fire more than a year ago.

Cllr Dee Laws, Fenland’s portfolio holder for planning, said: “Our residents can be assured that we understand how important this issue is to them and that we’re doing everything possible to support the restoration of this building.”

Sheila Stones, Inspector of Historic Buildings and Areas for Historic England, says the building is listed at grade II in recognition of its special architectural and historic interest.

Historic England is concerned, too, about the effectiveness of the façade retention scaffold “which does not appear to be sufficiently substantial”.

She said: “Historic England have serious concerns regarding the application on heritage grounds.”

Listing the features that the owners say should be retained during demolition, Ms Stones says that whilst Historic England agree these features are important “we are of the view that the building’s significance is not restricted to these features only, together with its front elevation.

“We strongly urge your authority to ensure that you are certain of what the outcome will be if this initial phase is carried out and there is then a significant delay before further works commence.”

She said she visited the site on June 22 with Historic England’s structural engineer.

“His assessment regarding the current condition of the building, in light of the devastating fire damage that occurred in April 2022, is provided below,” she said.

Advertisement
Advertisements
canopyuk.com in-article

Damage caused ‘widespread’

1: The damage caused by the 2022 fire is widespread and has potentially adversely affected a high proportion of the timber structural members.

Those timbers that were not burnt/excessively charred by the fire will have deteriorated by being exposed to rainwater/damp conditions over the last 14 months.

2: The masonry to the front elevation appears, from what can be seen from street level, to be in a reasonable condition.

No major fractures and/or bulges are evident, and the façade retention scaffold appears to be doing a reasonably satisfactory job.

3: How much restraint the remaining original structure behind is providing cannot be determined without altering the scaffold system to incorporate access platforms.

4: The rear elevation to the front block appears, from a distance, to be intact. However, there are a good number of sizeable openings above first floor level with what appear to be timber lintels.

5: The condition of the timbers cannot be confirmed at this time but given the prolonged exposure to rain/damp conditions, it can be expected that bearings will have softened/decayed.

6: Additionally, at first floor level there appears to be a large-span timber beam supporting the masonry above. This beam appears to be significantly charred to its full length; however, the depth of charring, and hence the beam’s residual section, is not known.

7: The structures to the rear of the site are in a similarly poor condition. Roof structures have completely been destroyed and the site covered in debris.

The most likely sequence of work would be to demolish unsafe structures to the rear of the site to allow debris clearance to commence.

8: Access through the front elevation is likely to be precluded due to concerns relating to the integrity of the suspended floor over the basement.

Close supervision will be needed

Localised clearance to the rear would then allow further inspections and assessments by the professional team on the scope of further works.

9: This does however require close supervision by the Local Authority to ensure they are content with the extents of demolition.

An agreed level of recording would also need to be in place prior to any works commencing.

10: Any commentary/assessment on the front elevation (or other sections to remain) is not currently included.

Some further preliminary assessment of the significant frontage and its potential for retention should therefore be undertaken.

Together with options for altering the façade retention scaffold to provide a greater degree of restraint and access to allow the potential removal of the floors etc behind.

11: The design of this façade retention scaffold must consider the presence of the basement/cellar and the effects of any surcharging of the ground adjacent to this from any kentledge required.

12: The local authority need to be confident in knowing what will remain of the building once this stage of works has been completed.

‘Not sufficiently clear in scoop’

This should include any temporary weatherproofing to key retained elements, storage of materials, recording of building details etc all to allow the subsequent reconstruction of the building.

The council’s conservation officer has also produced a report which notes that there is “a strong feeling that the application is not sufficiently clear in its scope and intentions to meet the requirements of national legislation and policy regarding the safeguarding of listed buildings and conservation areas.

“It is therefore at odds with the obligations clearly set out in national legislation for which the LPA (local planning authority) are bound by.

“It should be made clear that the LPA are keen to see this application and a forward plan agreed as soon as possible owing to the disruption to the high street as well as the continuing decay of any salvageable materials whilst these elements continue to be exposed to the elements.”

An application to demolish what is left of 5 Market Place Wisbech is before Fenland District Council.

Site owners of Cashino

The owners are Indylby Investments and Biscuit Investments and the Lincoln based company has prepared a comprehensive package of proposals.

Under the heading of ‘possible items for recovery during clearance’ is the report sets out the following:

Known to have survived:

  • Two cast iron fireplaces in the second and third floor level rear rooms (in reasonable condition):
  • An iron pattress plate visible on the rear wall of the front structure (in good condition):
  • The brass “PIANOES” plinth cap by the front entrance (in quite poor condition):
  • Decorative 19th century shop front fittings include pierced iron work (in reasonable condition):
  • The sole surviving 16-pane sash window frame at the 2nd floor front (condition unknown):
  • The “good Adam style chimney piece” in the 2nd floor front room (condition unknown):

Fire crews from Cambridgeshire, Norfolk and Lincolnshire tackled the blaze at Market Place which housed a gaming centre, Cashino, in Wisbech.

The fire broke out at around 6.15pm on April 22.

 

 

Tags: CashinoFenland District CouncilHistoric EnglandHomepageListed building burnt out WisbechMarket Place Wisbech
ShareTweetSend
Next Post
News for Peterborough and Cambridgeshire - UNISON Eastern regional organiser Cameron Matthews said: “Huntingdonshire District Council has taken us through the looking glass. Instead of ending this pay dispute they’ve decided to provoke workers into striking.”

UNISON call off planned strike at Huntingdonshire District Council

News for Peterborough and Cambridgeshire - Pictured above is Sean Finlay with his Wisbech guests at Peckover House. Mr Finlay and his friends took a party of asylum seekers currently being housed at Rose and Crown Hotel out for a visit to the National Trust property.

Iraq, Iran, Sudan and Kurdistan asylum seekers enjoy day out in Wisbech

Help us by Donating

Latest News

News for Peterborough and Cambridgeshire - Images of the Comberton property before and after renovation
News

75 empty homes brought back to life across South Cambridgeshire

October 17, 2025
News for Peterborough and Cambridgeshire - A Cambridgeshire road safety campaigner has accused the county council of unfairly neglecting rural areas after a car towing a caravan was forced to uncouple on the approach to Stonea Bridge — a notorious blackspot with a 50mph speed limit that has not been reduced for decades.
Cambridgeshire County Council

Caravan stuck at Stonea Bridge sparks row over ‘unfair’ road safety funding

October 17, 2025
News for Peterborough and Cambridgeshire - Ryan Coogan (left) Reform organiser for Cambridgeshire and (right) Farcet and Yaxley county councillor Des Watt who has quit the party and is now an independent.
Exclusive

Reform rocked as Cambridgeshire councillor quietly quits the party

October 18, 2025
News for Peterborough and Cambridgeshire - The city’s new digital gateway for culture, heritage and events — discoverpeterborough.co.uk — has been launched, and Peterborough has officially established its new independent Destination Management Organisation (DMO), the Peterborough Tourist Board, chaired by Andrew Pakes MP
News

Discover Peterborough: new independent tourist board to lead the city’s visitor economy

October 16, 2025
News for Peterborough and Cambridgeshire - At a meeting of Full Council tonight (Wednesday), Councillor Shabina Qayyum said she was “calling out” the comments made online and via email about Cabinet member for finance and corporate governance, Councillor Mohammed Jamil.
News

Peterborough Council leader vows zero tolerance after racist threats to councillor

October 15, 2025
News for Peterborough and Cambridgeshire - Looking south west across the application site with the drainage ditch along the northern boundary visible where the crop colour changes
Fenland District Council

Whittlesey residents outraged as Fenland council approves 249-home development

October 15, 2025
News for Peterborough and Cambridgeshire - January 2020: A new housing development by Mendesham Homes in Stanground was named in memory of the stable owner who devoted her life to teaching children how to ride horses. Peggy Fishpool used to run the stables on the land which has now been developed to provide 24 two and three-bedroom affordable homes and 6 one-bedroom apartments.
News

Peterborough City Council to exit Medesham Homes: has it lost out on its housing venture?

October 15, 2025
News for Peterborough and Cambridgeshire - Mayor Paul Bristow: “We should aspire to be the UK’s fastest growing local economy outside the capital. Growth attracts investment, creates high-skilled jobs and helps fund the infrastructure we need for a stronger, fairer, faster-growing economy. Growth also brings the healthier, wealthier and happier Cambridgeshire and Peterborough we all want to see.”
News

Local growth plan sets Cambridgeshire & Peterborough on path to become Europe’s Silicon Valley

October 15, 2025
  • Trending
  • Comments
  • Latest
News for Peterborough and Cambridgeshire - Ryan Coogan (left) Reform organiser for Cambridgeshire and (right) Farcet and Yaxley county councillor Des Watt who has quit the party and is now an independent.

Reform rocked as Cambridgeshire councillor quietly quits the party

October 18, 2025
News for Peterborough and Cambridgeshire - Looking south west across the application site with the drainage ditch along the northern boundary visible where the crop colour changes

Whittlesey residents outraged as Fenland council approves 249-home development

October 15, 2025
News for Peterborough and Cambridgeshire - At a full council meeting on (October 15), members are expected to approve the appointment of solicitor Graham Kitchen as the authority’s new interim Monitoring Officer from 1 November 2025.

Double departure rocks Peterborough City Council as two top legal chiefs move on

October 15, 2025
News for Peterborough and Cambridgeshire - Illustrative view Main Site Entrance - New Bridge Lane

Updated visuals released for £450m Wisbech energy-from-waste facility

October 13, 2025
News for Peterborough and Cambridgeshire - Images of the Comberton property before and after renovation

75 empty homes brought back to life across South Cambridgeshire

0
News for Peterborough and Cambridgeshire - A Cambridgeshire road safety campaigner has accused the county council of unfairly neglecting rural areas after a car towing a caravan was forced to uncouple on the approach to Stonea Bridge — a notorious blackspot with a 50mph speed limit that has not been reduced for decades.

Caravan stuck at Stonea Bridge sparks row over ‘unfair’ road safety funding

0
News for Peterborough and Cambridgeshire - Ryan Coogan (left) Reform organiser for Cambridgeshire and (right) Farcet and Yaxley county councillor Des Watt who has quit the party and is now an independent.

Reform rocked as Cambridgeshire councillor quietly quits the party

0
News for Peterborough and Cambridgeshire - The city’s new digital gateway for culture, heritage and events — discoverpeterborough.co.uk — has been launched, and Peterborough has officially established its new independent Destination Management Organisation (DMO), the Peterborough Tourist Board, chaired by Andrew Pakes MP

Discover Peterborough: new independent tourist board to lead the city’s visitor economy

0
News for Peterborough and Cambridgeshire - Images of the Comberton property before and after renovation

75 empty homes brought back to life across South Cambridgeshire

October 17, 2025
News for Peterborough and Cambridgeshire - A Cambridgeshire road safety campaigner has accused the county council of unfairly neglecting rural areas after a car towing a caravan was forced to uncouple on the approach to Stonea Bridge — a notorious blackspot with a 50mph speed limit that has not been reduced for decades.

Caravan stuck at Stonea Bridge sparks row over ‘unfair’ road safety funding

October 17, 2025
News for Peterborough and Cambridgeshire - Ryan Coogan (left) Reform organiser for Cambridgeshire and (right) Farcet and Yaxley county councillor Des Watt who has quit the party and is now an independent.

Reform rocked as Cambridgeshire councillor quietly quits the party

October 18, 2025
News for Peterborough and Cambridgeshire - The city’s new digital gateway for culture, heritage and events — discoverpeterborough.co.uk — has been launched, and Peterborough has officially established its new independent Destination Management Organisation (DMO), the Peterborough Tourist Board, chaired by Andrew Pakes MP

Discover Peterborough: new independent tourist board to lead the city’s visitor economy

October 16, 2025

Follow us on Twitter

More News

News for Peterborough and Cambridgeshire - At a full council meeting on (October 15), members are expected to approve the appointment of solicitor Graham Kitchen as the authority’s new interim Monitoring Officer from 1 November 2025.
News

Double departure rocks Peterborough City Council as two top legal chiefs move on

October 15, 2025
News for Peterborough and Cambridgeshire - Dennis Finbow, 77, a former parish priest at Our Lady of Lourdes in Dogsthorpe, appeared at Cambridge Crown Court on Friday (10 October), where the judge added 11 years to the sentence he is already serving for similar offences. PHOTO: Terry Harris
News

Former Peterborough paedophile priest jailed for further child sex offences after calling allegations ‘nonsense’

October 14, 2025
News for Peterborough and Cambridgeshire -
Peterborough City Council

Showground housing development in Peterborough faces refusal

October 13, 2025
News for Peterborough and Cambridgeshire - A decision by Peterborough City Council’s Cabinet to proceed with the sale of the unfinished Hilton Hotel site at Fletton Quays has been called in for further scrutiny, amid concerns about whether the move represents “best value” for the authority and the city. IMAGE: Terry Harris
News

£42,000-a-month cost puts pressure on council over Fletton Quays Hilton sale

October 13, 2025
News for Peterborough and Cambridgeshire - Illustrative view Main Site Entrance - New Bridge Lane
News

Updated visuals released for £450m Wisbech energy-from-waste facility

October 13, 2025
News for Peterborough and Cambridgeshire - Peterborough City Council is expected to agree a major step forward in its fight against addiction, awarding a new £25 million contract to deliver drug and alcohol treatment services across the city. IMAGE: Terry Harris
Peterborough City Council

Peterborough boosts drug and alcohol support with £25m contract

October 13, 2025
  • News
  • Local Council
  • Investigations
  • Things To Do
  • About
  • Privacy Policy
  • Contact Us

© COPYRIGHT - UNIT 2 FENGATE TRADEPARK PETERBOROUGH PE15XB

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
We use cookies on our website to give you the most relevant experience by remembering your preferences and repeat visits. By clicking “Accept All”, you consent to the use of ALL the cookies. However, you may visit "Cookie Settings" to provide a controlled consent.
Cookie SettingsAccept All
Manage consent

Privacy Overview

This website uses cookies to improve your experience while you navigate through the website. Out of these, the cookies that are categorized as necessary are stored on your browser as they are essential for the working of basic functionalities of the website. We also use third-party cookies that help us analyze and understand how you use this website. These cookies will be stored in your browser only with your consent. You also have the option to opt-out of these cookies. But opting out of some of these cookies may affect your browsing experience.
Necessary
Always Enabled
Necessary cookies are absolutely essential for the website to function properly. These cookies ensure basic functionalities and security features of the website, anonymously.
CookieDurationDescription
cookielawinfo-checkbox-analytics11 monthsThis cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Analytics".
cookielawinfo-checkbox-functional11 monthsThe cookie is set by GDPR cookie consent to record the user consent for the cookies in the category "Functional".
cookielawinfo-checkbox-necessary11 monthsThis cookie is set by GDPR Cookie Consent plugin. The cookies is used to store the user consent for the cookies in the category "Necessary".
cookielawinfo-checkbox-others11 monthsThis cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Other.
cookielawinfo-checkbox-performance11 monthsThis cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Performance".
viewed_cookie_policy11 monthsThe cookie is set by the GDPR Cookie Consent plugin and is used to store whether or not user has consented to the use of cookies. It does not store any personal data.
Functional
Functional cookies help to perform certain functionalities like sharing the content of the website on social media platforms, collect feedbacks, and other third-party features.
Performance
Performance cookies are used to understand and analyze the key performance indexes of the website which helps in delivering a better user experience for the visitors.
Analytics
Analytical cookies are used to understand how visitors interact with the website. These cookies help provide information on metrics the number of visitors, bounce rate, traffic source, etc.
Advertisement
Advertisement cookies are used to provide visitors with relevant ads and marketing campaigns. These cookies track visitors across websites and collect information to provide customized ads.
Others
Other uncategorized cookies are those that are being analyzed and have not been classified into a category as yet.
SAVE & ACCEPT

Add New Playlist

No Result
View All Result
  • 360 Examples
  • About
  • Advertise with us
  • ARTICLE FOOTER NOT FOR PUBLICATION
  • Basket
  • Beer Festival VR 360
  • Buy Adspace
  • Cambridgeshire
  • Cancel donation
  • Cathedral Example 360
  • Cathedral Plan
  • Checkout
  • Checkout
  • Civic Dash
  • Complaints
  • Contact Us
  • Cookie Policy
  • cookie-policy
  • crm
  • Elementor #420
  • Hide Ads for Premium Members
  • Home
    • CambsNews Live
  • Latest News
  • Media Consent Form
  • Memorial Garden Example
  • My Account
  • My account
  • Notices
  • Notices Form
  • Privacy Policy
  • PU test
  • Sample Page
  • Sample Page
  • Shop
  • SiteMap
  • Submit Your News
  • Support our work.
  • test2
  • Thank you for your donation
  • Upload your ads

© COPYRIGHT - UNIT 2 FENGATE TRADEPARK PETERBOROUGH PE15XB